Class 5 Feasibility study for pellet plant in Canada
Challenges:
- The client’s objective was to undertake refurbishment/ modernization/ upgrade of the 6.0 MTPA Iron Ore Pellet Plant, located at Point Noire, which is sub zero temperature zone.
- The client’s objective was to evaluate six possible optional configurations. These options have been summarized as :
Options | Straight Grate | Grate Kiln |
---|---|---|
3 X 2.0 MTPA Iron Ore Pellet Plant | ✓ | ✓ |
2 X 3.0 MTPA Iron Ore Pellet Plant | ✓ | ✓ |
1 X 6.0 MTPA Iron Ore Pellet Plant | ✓ | ✓ |
2 X 4.0 MTPA Iron Ore Pellet Plant | ✓ | NA |
1 X 8.0 MTPA Iron Ore Pellet Plant | ✓ | NA |
Solutions:
- Complete thorough market research of the corresponding geography done.
- Technical Evaluation of all technologies with respect to product quality, considering CAPEX & OPEX for all module done.
- Complete detailed TEFR with clear cut recommendation submitted to the client .